R&D Ability

It is the unremitting pursuit of our R&D Team to continuously provide customers with product improvement and efficiency improvement solutions. Wiltson has an R&D team with more than 10 years of experience in the battery industry, equipped with advanced eq



With over 10 years of experience in the development of new battery products, Wiltson R&D team has optimized the most cost-effective design scheme on the premise of reliability and manufacturability while developing the battery cell and battery pack to meet the basic requirements of customers on performance.


1. In order to ensure that the new battery type can be delivered to customers with maximum satisfaction, Wiltson sales engineers should get and understand completely customers' products original requirements which include:

     A. Battery dimensions and connection installation dimensions.

     B. Electrical performance data: Voltage, Capacity,  Max discharge and charge current, communication function, work environment, and Life expectancy, etc.

     C. The markets regulation and laws (option) i.e. UL, CE, RoHS, REACH, etc

     D. Other requirements i.e. cost targets


2. The design team provides feasibility analysis report to customers that include:

     A. Product development lead time, product costs, and molds costs.

     B. Design risk evaluation


3. Design engineers utilize FMEA, VE etc.advanced design technology, and the latest analysis system and design software to design a product. The involved design processes and documents are the following:

      A. Gathering all original requirements from customers set up Input documents lists

      B. Functional verification battery packs' 2D/3D drawings

      C. Make specification and manuals

      D. Evaluate the necessary for apply patent


4. Design verification

A. Design input/output review

B. Pilot test.: To test samples' full performance and validates all of the data meet specification's needs.

C. Evaluate the necessary for apply patent


5. Development plan

A. The development schedule, the updated implementation are shared with customers on time.

B. Molds development, Mold costs checking, Mold annotation

C. Production process preparation, new equipment, and facility confirmation, Productivity evaluation

D. Making samples and pilot run. Review capability, personnel organization


6. Customer approval
Customer test and validate the samples and pilot run. If not approved, we’ll make improved samples, and until the samples are approved by the customer.